Vishwa Samudra Kannur Expressway PVT Ltd
Introduction
National Highways Authorities of India (NHAI) has appointed Vishwa Samudra Kannur Expressway Private Limited, as the Concessionaire for the design and built of the 29.948 Km Six Laning of Thaliparambha to Muzhapillangad section of NH-17 (New NH-66) from Ch. 134+650 (existing km 137+900) to Ch. 164+958 (existing Km 170+600) in the State of Kerala on Hybrid annuity Mode under Bharatmala Pariyojna. The entire stretch passes through 12-villages of Kannur district with a length of 29.948 kms. The project road crosses Major River, few minor streams and paddy land. The general terrain along the road is plain with intermittent stretches falling under rolling terrain.
project scope
5 Viaducts
km 145+740, km 147+300, km 149+436, km 152+580, km 153+351
5 Flyovers
km 135+701, km 137+081, km 151+502, km 154+292, km 155+945
Major Bridge
km 144+314
1 Vehicular Overpass
km 144+890
3 Vehicular Underpass
km 140+960, km 151+892, km 157+802
3 Minor Bridges
km 150+956, km 153+730, km 158+746
3 Light Vehicular underpass
km 148+674, km 162+961, km 164+330
- 5 Viaducts (km 145+740, km 147+300, km 149+430, km 152+580, km 153+355)
- 5 Flyovers (km 135+705, km 137+080, km 151+505, km 154+295, 156+200)
- 1 Vehicular Overpass (km 144+900)
- 3 Minor Bridges ( km 150+955, km 153+739, 158+746)
- 3 Vehicular Underpass ( km 140+960, km 151+895, km 157+770)
- 3 Light Vehicular underpass (km 148+678, km 162+934, km 164+330)
- 91 cross drainage Box Culverts
The duration of the construction of the project is 910 days from the appointed date with 15 years of operation and maintenance period.
SUMMARY OF CHANGE OF SCOPE
4 Light Vehicular underpass
km 138+870, km 143+200, km 160+200, km 162+360
Vehicular Underpass
km 142+150
2 Vehicular Overpass
km 1470+752, km 155+000
Box Structure
km 142+300
- 5 Viaducts (km 145+740, km 147+300, km 149+430, km 152+580, km 153+355)
- 5 Flyovers (km 135+705, km 137+080, km 151+505, km 154+295, 156+200)
- 1 Vehicular Overpass (km 144+900)
- 3 Minor Bridges ( km 150+955, km 153+739, 158+746)
- 3 Vehicular Underpass ( km 140+960, km 151+895, km 157+770)
- 3 Light Vehicular underpass (km 148+678, km 162+934, km 164+330)
- 91 cross drainage Box Culverts
Project Details & Timeline
Name of the Project |
Muzhapilangad Section from km 134.650 to km. 170.600 of NH-17 (New NH-66) (Project Length 29.948 km) in the State of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojana |
EPC Contractor |
M/s Vishwa Samudra Engineering Pvt. Ltd. |
Independent Engineer |
M/s. LEA Associates South Asia Pvt. Ltd., New Delhi in association with M/s. Pioneer Infra Consultants Pvt. Ltd. |
Agreement Date |
31-March-2021 |
Appointed Date |
29-November-2021 |
Maintanance Period |
15 Years after commencing |
COD Construction Period |
30 Months (910 days) from Appointed Date |
NATIONAL HIGHWAY AUTHORITY OF INDIA
VISHWA SAMUDRA KANNUR EXPRESSWAY PRIVATE LIMITED
![](https://vske.in/wp-content/uploads/2022/12/img100.jpg)
SIX LANING OF THALIPARAMBHA TO MUZHAPILANGAD SECTION OF NH-17 (NEW NH-66) FROM CH. 134+650 (EXISITNG KM 137+900) TO CH. 164+958 (EXISTING KM 170+600) IN THE STATE OF KERALA ON HAM UNDER BHARATMALA PARIYOJNA.
LENGTH – 29.95 km, PROJECT COST – 2038 CORE
Description
-
The project connects Thaliparamba to Muzhapaligad region of the new NH 66
-
With the Provision of Six lane highway, the travel time will be drastically reduced.
Facilities:
-
Flyover-5
-
Viaduct -5
-
Major Bridge – 1
-
Minor Bridge -3
-
VUP -3
-
LVUP – 3
-
VOP -1
-
COS -3